Q4: Is the rate inclusive or exclusive of GST?

A: In the 2018-19 Karnataka PWD SoR, rates are generally inclusive of GST (unlike pre-2017 rates which were exclusive of tax), but exclusive of cess (like Labour Cess). Always read the "Note" section on the first page of the PDF.

Overall Verdict

A reliable reference for rate analysis and tender estimation in Karnataka PWD works from that period, but now outdated for current market prices. pwd schedule of rates 2018-19 karnataka pdf


Q2: Can I use the 2018-19 rates for compound interest calculation on delayed payments?

A: Yes. Arbitration tribunals frequently use the SoR of the contract year (2018-19) plus a prescribed escalation index (specific to Karnataka PWD) to calculate current due amounts. The Complete Guide to the PWD Schedule of

Weaknesses / Limitations

  1. Not valid for current projects – 6+ years old; material (steel, cement, fuel) and labour costs have risen 30–50% since.
  2. No GST impact – 2018–19 SoR is pre-final GST rate rationalisation; lacks clarity on input tax credit adjustments.
  3. No mechanical equipment hire rates – Only manual/animal-powered items included; excavators, dozers, transit mixers are missing.
  4. PDF is scanned/OCR-inconsistent – Some copies have poor resolution, missing annexures, or non-searchable text.
  5. No district-level market rates for reinforcement steel – Uses a single state average, which deviates from actual city prices.